Construction of a fire water basin

SGL Carbon

SCROLL

SGL Carbon

Augel built a fire water basin for the company SGL Carbon from Bonn in autumn 2015. To secure and fix the large excavation pit, we used an enormously heavy slide rail shoring with a span of 10 meters, which enabled us to excavate deeply and widely.

As a result of this, and due to accurate work, we were able to install the large precast concrete elements even in the narrow conditions of the industrial plant.

Client:
SGL Carbon
Place of execution:
Bonn
Execution time:
Autumn 2015 over a period of approx. 4 months
Mannschaft
5-10 Mitarbeiter

Chronologie der Baustelle