B257 GRW Ahrbrück New replacement building

New construction of a cycle and footpath bridge
as well as new cycle path

SCROLL

LBM Cochem

In the summer of 2018, AUGEL was commissioned by LBM Cochem to build a 24-metre-long cycle and footpath bridge to cross the Ahr. The construction project also included the new construction of a 120-metre-long cycle path along the Ahr river in order to integrate the new bridge into the existing cycle path. Due to the new construction of the bridge, the cycle path, which originally ran along a main road, could be relocated to the former Ahr valley railway line.

The project was executed in the FFH nature reserve and therefore required the use of environmentally friendly materials and bio-oil operated machines.

Client:
LBM Cochem
Place of execution:
53506 Ahrbrück
Execution time:
August 2018 – June 2019
Partner:
IBS-Ingenieure BgR

Chronologie der Baustelle

Services

Contact Persons